AC Shifting in Kochi
AC uninstallation and shifting in Kochi and Ernakulam: we pump the gas down into the outdoor unit, dismantle the AC carefully and reinstall it at your new home or office, then test the cooling. Reinstallation takes around 2–3 hours for a standard split AC. Book by phone or WhatsApp.

Shift Your AC Without Losing Gas or Damaging the Unit
Pulling an AC off the wall without a proper pump-down releases the refrigerant and can let moisture into the system. Then you're paying for a gas refill on top of the move.
Our technicians pump the gas back into the outdoor unit, seal the valves, dismantle the indoor and outdoor units carefully and cap the pipes. At your new home we mount everything, add piping if needed, vacuum, open the valves and test. We can do both ends of the move anywhere in Ernakulam district.
What’s Included in Our Shifting
Safe removal and re-installation when you move. Here’s the checklist our technicians follow on every visit:
- Gas pump-down
- Valve sealing
- Indoor unit removal
- Outdoor unit removal
- Pipe capping
- Packing for transport
- Re-installation
- Additional piping if needed
- Vacuum & leak test
- Cooling test
The Right Tools, and Parts You Approve
We use coil-safe cleaning chemicals, calibrated gauges and proper vacuum pumps — the same standards the manufacturers recommend. Every spare part is quoted with its brand and price, and we fit it only after you approve it.
Before we leave, we test cooling, check for leaks and clean up the work area. You get a simple digital bill with what was done, so your next service is even easier.
Not if the pump-down is done properly — that's the first step of every uninstallation we do.
Yes, anywhere in Ernakulam district, including Aluva, Perumbavoor and Tripunithura.
Yes, uninstallation alone is also available.
Removing an AC is quicker than installing one. Reinstallation at the new place takes about as long as a fresh installation — around 2–3 hours for a standard split AC.
Not always. If the existing pipes are in good condition and long enough, we can reuse them. If the new route is longer or the pipes are damaged, extra copper is quoted before we start.
Usually not, if the gas was pumped down properly. If the new pipe run is much longer, a small top-up may be needed — we’ll tell you and confirm the price first.
Get a Quote

Clear Prices, Tidy Work
Clear prices, tidy work and a technician who explains every step. You approve the price before we start.






