Moving into a new flat or villa? Use this checklist so your new AC cools well for years.
Most AC problems we fix later — leaks, dripping water, weak cooling — start with a rushed installation. Here's what a good installer should do, and what you should check.
Before installation
- Choose an indoor spot away from direct sunlight and above the bed or sofa, not facing it
- Plan the outdoor unit where air can flow freely and it's easy to service
- Keep the pipe run as short as possible
- Check there's a dedicated power point with the right rating
During installation
- Indoor unit mounted perfectly level
- Drain pipe sloping downward all the way
- Copper flares made with the right tool and tightened properly
- System vacuumed before releasing gas
- Leak test on all joints
After installation
Run the AC for 15 minutes and check the outlet air is cold, there are no drips, and the outdoor unit isn't vibrating. Keep your invoice — it matters for your brand warranty.
Choosing the right size (tonnage)
As a rough guide for Kochi homes: 1 ton for rooms up to about 120 sq ft, 1.5 ton for about 120–180 sq ft and 2 ton for about 180–250 sq ft. Add capacity for top-floor flats, west-facing rooms, big windows or kitchens nearby.
Do you need a stabiliser?
Many inverter ACs are designed for a wide voltage range and don’t need a separate stabiliser. Older and fixed-speed models often do. Check the manual — or ask us before installation and we’ll tell you.
Quick answers
How long does split AC installation take?
About 2–3 hours for a standard split AC, including mounting, piping, vacuuming and a cooling test.
Is copper piping included in installation?
Standard installation includes up to 3 m of piping. Extra copper, stands or a stabiliser are quoted before we start.
Can you install an AC I bought online?
Yes — we install split and window ACs from any brand or store.
We handle AC installation with vacuuming and a cooling test included.



